Effortless 5 Steps to Install Cold Control Oasis Water Cooler

Installing a Cold Control Oasis water cooler is a straightforward process that ensures your unit operates efficiently and provides you with clean, refreshing water. This comprehensive guide will walk you through the step-by-step installation process, covering essential technical specifications, and offering valuable DIY tips to help you get the most out of your Oasis water cooler.

Choose the Ideal Location

The first step in installing your Cold Control Oasis water cooler is to select the perfect location. The unit should be placed on a level floor, away from direct sunlight and any sources of ventilation. This will help maintain the optimal temperature and prevent any potential issues with the unit’s performance.

Prepare the Unit for Installation

How to Install Cold Control Oasis Water Cooler

If your Oasis water cooler was transported horizontally, it’s crucial to leave it in an upright position for at least an hour before installation. This allows the oil to drain back into the compressor, ensuring the unit operates smoothly. Additionally, check the hot tank drain plug to ensure it’s securely tightened to maintain the warranty.

Install the Water Bottle

To install the water bottle, follow these steps:
1. Remove the funnel by turning it counterclockwise and lifting it up.
2. Remove the no-spill device by pulling it straight out of the top.
3. Insert the baffle, making sure it’s properly positioned.
4. Reinstall the funnel and no-spill device.
5. Place the water bottle with the no-spill cap onto the unit, peeling off the label and gently inverting it onto the probe.

Activate the Hot Faucet

Before using the hot water function, it’s essential to activate the hot faucet. Squeeze the hot faucet lengthways and pull down to remove any air from the hot tank. This step helps prevent physical damage to the unit.

Clean and Sanitize the Unit

To ensure your Oasis water cooler is clean and sanitized, follow these steps:
1. Remove the baffle and clean the reservoir with soap and water.
2. For sanitation, mix 1/2 teaspoon of bleach per cup of water, let it sit for about five minutes, and then drain and flush out through the cold faucet.
3. On hot models, open the hot tank drain and flush it out.

Plug in the Unit and Power On

Plug the Oasis water cooler into a GFCI outlet and turn on the hot tank if needed. The unit should be ready for use in about half an hour.

Technical Specifications

  • The thermostat is set to deliver water at approximately 7°C (44.6°F). For colder water, adjust the screw on the thermostat clockwise.
  • The water dispenser controls include a control panel and an adjustable “cold” water thermostat.

DIY Tips

  • Always install the unit on a level floor to ensure proper operation.
  • Use a small flat screwdriver to adjust the thermostat.
  • Ensure the dispenser is placed on an even surface that can support its weight.
  • If the water dispenser is not dispensing water, check for possible ice build-up due to the thermostat being set too cold. Unplug the dispenser overnight and then reset. Set the thermostat to a warmer setting, slowly increasing based on your use and need for cold water.

References

  1. Oasis Coolers User Guide
  2. Oasis Coolers Installation Manual
  3. YouTube: How to set up a new Oasis Water Cooler

By following these detailed instructions, you can successfully install your Cold Control Oasis water cooler and enjoy the benefits of clean, refreshing water at your fingertips. Remember to refer to the technical specifications and DIY tips to ensure optimal performance and longevity of your Oasis water cooler.